Choose your country or region


South Africa

EN

Canada

FR EN

México

ES EN

United States

EN

Australia

EN

China / 中国

ZH EN

India

EN

South Korea / 대한민국

KO EN

Malaysia

EN

Singapore

EN

Taiwan / 台灣

ZH EN

Thailand

TH EN

Vietnam

VI EN

Česká Republika

CS EN

Denmark

DA EN

Deutschland

DE EN

España

ES EN

France

FR EN

Ireland

EN

Österreich

DE EN

Polska

PL EN

Schweiz / Suisse / Svizzera

DE FR IT EN

Sweden

SV EN

Netherlands

NL EN

Norway

EN

Global

EN

Please start typing to get suggestions.

Website results

Suggestions are being loaded.


Product suggestions

Suggestions are being loaded.


Savings of process costs

Customer and task

The Carinthian family business Pichler specializes in energy-saving ventilation systems for greater comfort indoors. In turn the company is achieving considerable savings in its process costs for the management of C-parts with the SmartBin integrated management system from Bossard.

One of Pichler’s development priorities is highly efficient ventilation systems for multi-story residential buildings. An integrated humidifier ensures an optimal room climate at the push of a button. Depending on the request, Pichler offers ventilation units for centralized or decentralized systems which are certified by the Passive House Institute in Darmstadt. Current references include the passive house residential park of Eurogate in Vienna with 150 apartments, the 3rd Olympic village (03) in Innsbruck, a 444-apartment passive house system and the new DC Tower in Vienna, Austria’s tallest structure.

Solution
save on process costs

Since the introduction of an automated C-parts management from Bossard in 2012, the company has been scheduling the C-parts via a single partner. Thus Pichler has been able to reduce costs for procurement, storage and supply and consequently create capacity for activities that add value. In addition it is guaranteed that the subsequent assembly of C-parts for the in-house production of ventilation equipment and air humidification units works reliably and on time. Thus the expertise remains in the hands of the supplier while Pichler can concentrate on core activities.

Customer benefits
Pichler Business man

Through the SmartBin integrated management system Pichler is achieving savings of up to 60% of process costs in the area of management of C-parts.